New floor in place!
- Stobirk Spirits and Distillery .
- Apr 7
- 1 min read
Things are moving now!
The floor drains are in place, and the first self-leveling compound is being applied. It must cure for a week before the next layer goes on.
After that, we can finish painting the distillery and bottling room walls.
It’s not long now until everything is finally in place!